What We Handle for Landowners
As your development partner, GS Sowmiya Builders takes complete responsibility for technical, regulatory, and construction execution.
Site Feasibility & Design
Comprehensive assessment of road width, frontage, setbacks, soil strata, and optimal unit configurations (2 BHK & 3 BHK floor plans) compliant with Vastu.
Statutory Sanctions & Permits
End-to-end processing of GCC / CMDA plan sanction, CMWSSB water/drainage clearance, TANGEDCO power connections, and statutory compliance.
Turnkey Construction Execution
Uncompromising civil engineering, branded fixtures, lift installation, backup generator provision, landscaped perimeter, and timely project delivery.
How a Joint Venture Progresses
A step-by-step collaborative process built on mutual clarity, legal security, and structured development milestones.
Initial Meeting & Site Review
Discussion of landowner aspirations, plot measurement review, title inspection, and preliminary site evaluation.
Feasibility & Sharing Proposal
Presentation of 2D concept floor plans, total buildable area calculations, and transparent sharing proposal.
Legal Vetting & Agreement
Drafting and registration of Joint Venture Agreement and Development Power of Attorney with clear unit demarcations.
Plan Sanction & Construction
Obtaining CMDA/GCC plan approvals, mobilization on site, structural RCC casting, and full finishing works.
Handover of Owner Units
Completion certificate, final inspection, handover of landowner's brand-new finished apartments, and utility connections.
Joint Venture FAQs
Practical answers regarding plot eligibility, legal agreements, sharing ratios, and construction management.
For our preliminary review, copies of the title deed / sale deed, parent documents, Patta, Town Survey Land Record (TSLR) / FMB sketch, Encumbrance Certificate (EC for 30 years), and property tax receipt are helpful. This enables our legal and engineering teams to confirm plot measurements and development feasibility.
Residential joint ventures in Chennai typically work best on plots measuring 1 ground (2,400 sq.ft.) or more, with minimum road widths of 24 to 30 feet to allow multi-floor residential sanctions (Stilt + 3 floors) and required car maneuvering spaces.
The sharing arrangement depends strictly on the micro-market location, prevailing land price vs construction cost, road width, permissible FSI, and project specifications. We conduct an open, transparent calculation with the landowner to arrive at a fair and equitable sharing structure.
No. In a standard joint venture model, GS Sowmiya Builders finances and executes 100% of the architectural drawings, statutory approval fees, civil construction, interior common area finishing, lift installation, and utility line charges.
Yes. Before internal masonry and electrical/plumbing works are carried out, landowners can customize interior room partitions, electrical switch points, tile selections, and sanitary fitting choices to match their personal family requirements.